Our 16,000 ft² facility has the physical infrastructure — high-power hydraulics, dynamometers, thermal chambers, HIL test rigs. But what moves a project forward is decades of analysis applied to the result.
30+ yrs
CFD
Turbines, pumps, valves, full systems, cavitation, two-phase flow.
20+ yrs
FEA
Structural dynamics, non-linear analysis, fatigue.
30+ yrs
Modeling & controls
Physics-based dynamic modeling of hydraulic systems, including HIL, MIL, and SIL.
16,000 ft²
Test facility
High-power hydraulics, dynamometers, thermal chambers, and HIL test rigs.
We've done this in hydropower before
Tidal energy harvesting
Wave energy systems
Open channel harvesters
Tow tank programs